Project Overview
A high-footfall toilet block built to take constant holiday-park use
The Park Holidays Malvern refurbishment replaced a tired toilet block with a full Mirage fit-out, specifying the toilet cubicles, lockers, vanity units and benching together so the whole room shares one hard-wearing finish.
Malvern's washrooms see a steady flow of holidaymakers throughout the day, so the specification needed to hold up to frequent use and quick turnaround cleaning between peak periods without the finish deteriorating.
Items Supplied
- 12mm SGL Cubicles
Mirage toilet cubicles in 12mm solid grade laminate, chosen to take daily knocks and frequent cleaning without the finish wearing. - 12mm SGL Lockers
Commercial changing lockers fitted with coin-operated locks for the park's pay-per-use changing areas. - Split Level Vanity Units
Vanity units topped with seamless solid surface, joint-free and quick to wipe down between cleans. - Wet Area Benching
Heavy-duty seating benches for the block's changing and drying areas.
Why Mirage suited a high-use toilet block
For a WC block handling this volume of daily footfall, Mirage's 12mm SGL panels resist the knocks and scuffs that come with constant use while staying easy to wipe down between cleans. It's this combination of toughness and low upkeep that made it the right fit for Malvern's toilet and washroom facilities.
Project Gallery
Refurbishing a toilet or washroom block?
For a toilet-block refurbishment like Malvern's, we specify the cubicles, IPS panels, lockers, vanities and benching as one coordinated package, with CAD layouts where the room needs planning out.
Request a quotation