Commercial Washroom Case Studies
Real UK project examples showing toilet cubicles, IPS service access panels, vanity units and coordinated commercial washroom products supplied by Total Cubicles.
Project evidence for architects and specifiers
Each case study below is a completed commercial washroom supplied by Total Cubicles as a coordinated package – cubicles, IPS service access panels, vanity units, lockers and benching from a single UK manufacturer. They are here to help you judge material routes, sector fit and specification detail before writing us into a project.
Liverpool John Lennon Airport
High-traffic terminal washrooms specified in solid grade laminate for durability, with coordinated toilet cubicles, IPS service access panels and vanity trough housing supplied to match.
Read case study
Park Holidays – Malvern
A holiday park washroom refurbishment using the moisture-resistant Mirage 12mm SGL range for frequent use and quick-turnaround cleaning, with coin-operated lockers, solid surface vanity units and wet-area benching.
Read case study
Park Holidays – Amble Links
A wet-area changing facility fitted with Mirage 12mm SGL changing and shower cubicles, plus coordinated wet-area lockers, split-level vanity units and benching built to withstand constant moisture.
Read case studyWhy architects and specifiers choose Total Cubicles
We manufacture and supply the whole washroom from one place, so a single specification stays consistent across cubicles, IPS panels, vanity units, lockers and benching – without coordinating multiple suppliers.
- Material routes matched to the environment. Solid grade laminate and compact laminate for wet, humid and high-traffic areas; MFC and moisture-resistant MFC for dry washrooms.
- Coordinated, single-source supply. Cubicles, IPS service access panels, vanities, lockers and benching specified and delivered together to one finish schedule.
- Delivered across demanding sectors. Transport, leisure and holiday-park washrooms built for constant use, moisture and quick-turnaround cleaning.
- Specification support on hand. Compliance and material guides (Approved Document T and M, SGL vs HPL vs MFC), colour and finish selection, and direct project advice.
Frequently asked questions
- What types of commercial washroom projects are shown in these case studies?
- The case studies show supplied commercial washroom packages including toilet cubicles, IPS service access panels, vanity units, lockers, benching and related washroom products.
- What does SGL mean?
- SGL means solid grade laminate, a dense laminate panel material used for hard-wearing commercial washroom environments.
- What are IPS panels?
- IPS panels are Integrated Plumbing System panels. They conceal pipework, cisterns and services while allowing controlled maintenance access.
- Can Total Cubicles supply similar packages for new projects?
- Yes. Similar coordinated washroom packages can be specified for airports, schools, leisure centres, holiday parks, offices, public buildings and transport facilities.